Long-horizon business incubation and consulting

Tool

Runway calculator

Cash, burn and, if you want it, burn growth in. Months of runway out, with every step shown.

What the runway calculator works out Cash, net burn and burn growth go in; runway in whole months comes out, with the working shown.

You put in

  • Cash in the bank
  • Net burn a month
  • Burn growth, if any

Calculate Divides, month by month

You get back

  • Runway in whole months
  • Every step of the working

Diagram: World Enterprise Group Incorporated. Illustrative: it shows the working, not any figure of yours.

Your numbers stay on this page. Nothing is saved or sent anywhere, and nothing is put in the address bar. Use one currency for every amount. The results carry no currency sign.

Cash and burn

What the company holds, how fast it is falling, and, if you want to see it, how fast that fall is speeding up.

What the company holds now, in one currency.

Cash out less cash in over a month. Enter 0 if cash grew.

Optional. How much faster burn grows each month, from 0 to 100.

Runway at level burn
Waiting
Enter Cash on hand, Net burn per month to see this.
An illustration from your inputs, not advice.
Runway with growing burn
Waiting
Enter Cash on hand, Net burn per month, Burn growth per month (%) to see this.
An illustration from your inputs, not advice.

How each number is worked out

Every result above comes from the formula in this table. Whichever you report, say which one you used and what you assumed.

Formulas and assumptions for the runway calculator
ResultFormulaAssumptions
Runway at level burn Cash on hand divided by net burn per month, rounded down to one decimal place.
  • Net burn stays the same every month.
  • Cash on hand is the money in the bank today, not money owed to the company.
  • Net burn is cash out less cash in over a month, so a month with no net burn has no runway to count.
  • The count stops at 1,200 months, which is 100 years.
Runway with growing burn The first month uses the net burn you entered. Each later month uses the month before it multiplied by 1 plus the growth percent divided by 100. Add up the months until the next one would use more than the cash left. Runway is the whole months funded plus the cash left divided by that next month’s burn, rounded down to one decimal place.
  • Burn grows by the same percent every month.
  • A burn that falls is not modeled. Enter 0 for growth and use level burn.
  • The count stops at 1,200 months, which is 100 years.

Your numbers stay on this page

The calculator works in your browser. It sends nothing, it saves nothing, and it does not put your numbers in the address bar, so closing the tab removes them. The page makes no request after it loads, and you can confirm that in your browser’s network panel.

What the results are not

The results are arithmetic on the numbers you typed. They are not advice, a forecast, or a statement about whether anyone will invest, and WE makes no promise of funding. The calculator cannot tell whether an entry is right. It does not say how much runway is enough, because that depends on your plan and no source supports a number.

Level burn and growing burn

Runway at level burn tells you what happens if nothing changes, and something will. It is the same division the metrics calculator uses for runway. The second result lets you try a burn that grows by a percent each month, and the working shows each step so you can check it by hand.

Round down

Runway is rounded down to one decimal place, because a figure rounded up flatters the position. The article on runway and burn works through one invented example.

Request the brief: Funding paths

Read the open abstract first. The full brief arrives by email after you ask for it.

WE makes no promise of funding.